Tight Space, Small Access? No worries!
Considerations when developing property
A valued Ashcroft Homes client purchased a new property with the intention of developing the site, adding a new home which could later be sold. The property comprised of a three-bedroom home with land at the rear where the client planned to add the new home. The existing house was tenanted and it was ideal if the tenancy could stay intact throughout the build to provide the owner with a steady income stream. However, the available land was a tight space.
After reviewing the site, the Ashcroft team concluded that a new five bedroom Rocheford home could be built at the rear. However a couple of small challenges presented. A separate driveway would be required for the new home and this would require a street crossing. The natural position for this new crossing would involve removal of a tree on the berm. After preparing a Resource Consent application and presenting their arguments, the Ashcroft team successfully gained permission for the additional street crossing and removal of the tree.
Ashcroft’s Rocheford design would provide the client with the largest house possible on this land, optimising the resale value. While this design made very good use of the site, it did mean there was little spare land for storage of materials during the build, potentially causing an issue for the tradies onsite. The Ashcroft Project Manager’s solution was to reorganise the project’s material delivery schedule, so more frequent but smaller deliveries could be made which addressed the storage issue.
The project ran to schedule and on conclusion, the client sold the newly built Ashcroft home, retaining the original rental property for their own property portfolio.
The client told us they were extremely impressed with the speed and quality of construction and enjoyed the frequent and clear communication they received from Ashcroft throughout this development project.
They have now purchased further properties and have again engaged Ashcroft Homes to assist with these developments.


More Project Insights

Development Potential Grows Considerably with New Unitary Plan
Our client owned two properties that sat side by side. Both properties had an existing single level 3 bedroom home.

Ashcroft Tenacity Paid Off For This Challenging Resource Consent Application
The Ashcroft Subdivision and Planning team proved once again their expertise and commitment to getting client projects over the line.

How a Fresh Strategy Saved this Project When the Market Shifted
When our returning client purchased a house on a large section in Avondale, the initial plan was impressive: demolish the existing house and construct three modern homes, 2 three-storey Highgate duplex and a stand-alone Kingston at the rear.
